April 30, 2015
Far Rockaway, NY
Just added a hatch for the trunk cabin...(more)
A shot from inside the deckhouse.
After weeks of arguing about the window...(more)
Same on the port side. We considered...(more)
Countertop is on, with teak trim.
One of my favs. Really wanted...(more)
Panel's been mounted. Now just need to...(more)
Head door window will be on a slide...(more)
Cabinet/closet space on the starboard side...(more)
Finishing touches being put in place on...(more)
April 26, 2015
Far Rockaway, NY
Couldn't be any more pleased with this...(more)
Stern station is built a few inches off...(more)
Starboard side build-out in the...(more)
Port side build-out in the trunk cabin...(more)
Permanently-mounted oil change pump...(more)
Battery charger and and other electrical now...(more)
Fuel filters being mounted now.
April 12, 2015
Far Rockaway, NY
Progress continues on the boat and we're counting down the days until we're back on the water. Only a few more weeks and still lots of work to be completed. However, we're on track and pretty excited. We've already started booking trips, so please don't forget about us if you're thinking of making the trip to Montauk this summer or fall. We won't know how many we can carry for certain until the final USCG inspection. However, we're being told "unofficially" it will likely be in the 20-passenger range. Give us a call if you have any questions. We'll be at Westlake Marina again this year, but will be moving over a few slips to one that can accommodate us. Looking forward to seeing everyone!
Now that the glasswork inside the deckhouse...(more)
Just constructed the wall opposite the head...(more)
Here's the frame for one set...(more)
And here are where the drawers are born...
Port side drawers are just about done...(more)
March 28, 2015
Far Rockaway, NY
First step to the visor on the…(more)
Braces were made to increase strength.
All framed out and ready to be glassed.
Last shot before it becomes permanent.
Finished product. Visor is framed,…(more)
Here's a shot of the starboard side of…(more)
March 14, 2015
February 1, 2015
Far Rockaway, NY
Starboard side of the deckhouse being fitted in
A shot from the stern of the sides getting…(more)
The sides are getting glassed in. The windows…(more)
Starboard side of the back of the deckhouse after…(more)
Port side of the back of the deckhouse…(more)
Look at those lines! There was plenty…(more)
Generator getting dropped it. It'll be…(more)
Bye bye...The generator is in and the hatch is …(more)
January 11, 2015
Far Rockaway, NY
Still pulling things apart these last few weeks…(more)
Flanges are out and now prepping the glass…(more)
Now for the ‘building’ part. The guys have…(more)
The new forward deck. Not yet permanent, but it's built.
The boss! Even I (Jill) can't be the boss on this project! :)
Need to crown the roof to carry back…(more)
Walls to the back of the deckhouse…(more)
Butchy's working on framing the head.
This pic is a little grainy (it's actually all the…(more)
A shot from the cockpit. You can see the frame…(more)